The appellant challenges the meter faultiness and contended that the A/C unit became faulty and since the process of renovating the first floor was going on, resulted in the comparatively lower meter reading and consumption. The appeal was disallowed and confirmed the decision of CGRF. |
![]() ![]() |
|
As per tariff order dated 27/11/2007, the demand charges of a HT consumer can be raised only for 75% of the agreed contract demand or the recorded Maximum Demand, whichever is higher. The contract demand of the consumer has been reduced w.e.f. 1/2/2008 as per CGRF’s order and hence consumer demands for the refund at least from that date. Held that the case filed before the Hon. High Court is not a bar for releasing the excess MD collected from the consumer during the period from 2/08 to 12/09, since the dispute before High Court pertains to the period of 11/05 to 2/08 only and KSEB does not have case against the requested period. |
![]() ![]() |
|
The appellant alleges that the respondent is reluctant to comply the decisions taken in the Adalath and deviating from the assurance given for installing a transformer. The present Peak voltages at the load end (LT side) as reported by the AEE is found to be less than the permissible limits prescribed by the Rules. Held that the voltage improvement works proposed and approved by the KSEB earlier is found reasonable and the respondent shall execute the same work on priority. |
KERALA ELECTRICITY OMBUDSMAN
D.H. Road & Foreshore Road Junction,
Near Gandhi Square,
Ernakulam, Kerala-682 016
Ph: 0484 2346488, Mob: 8714356488
Send an email to info@keralaeo.org
![]() | Today | 1131 |
![]() | All | 6141603 |
P/07/2025, Sri.P.R.Gireesan |
04-04-2025 |
P/06/2025, Sri. Sajan.Varghese |
04-04-2025 |
P/05/2025, Sri. Ratheesh.N |
04-04-2025 |
P/04/2025,Smt. Sabeena.N |
04-04-2025 |
P/03/2025, Sri,Biju.Tom |
04-04-2025 |
P/02/2025,Sri.Ajayakumar.V,R |
04-04-2025 |
P/01/2025,Sri. Denny Simon |
04-04-2025 |
P/086/2024, Sri.C.P Prabhakumar |
04-04-2025 |
P/084/2024,M/s. Swaraj Bio Fuel Energy |
10-03-2025 |
P/083/2024, Sri. Swapnaraj Ravikumar |
10-03-2025 |