KERALA ELECTRICITY OMBUDSMAN
D.H. Road & Foreshore Road Junction,
Near Gandhi Square,
Ernakulam, Kerala-682 016
Ph: 0484 2346488, Mob: 8714356488
Overview | Search Downloads | Submit file | Up |
Category: Orders | ||
Orders | Files: 1297 | |
Orders of Kerala Electricity Ombudsman in pdf format |
P/039/2024, Shri.Moideen Haji |
|
The appelant Shri.Moideen Haji is the Consumer of the Licensee (KSEBL) under their electrical section Puthenathani having consumer number 1165711041204 under the tariff LT.VI.G. The power is availed for the functioning of a private hospital named ‘Trust Medical Centre’, at Randathani, Malappuram. The connected load is 37 Kw in 3 phase connected through a ‘CT’ meter with ‘CT’ ratio 200/5. On 18/01/2023 an, inspection was conducted by AEE and found that CT’s were connected wrongly to the meter. Secondary terminal of Y phase ‘CT’ is connected with the B phase terminal of the meter and B phase of ‘CT’ terminal connected to Y phase terminal of meter. Hence the meter was recording the consumption less than the actual consumption. A parallel meter was connected from 23/01/2023 to 27/01/2023 and found that the meter was recording 40% less than the actual consumption. The short assessment prepared by the licensee and send the demand notice to the appellant for Rs. 5,50,810/-. The appellant filed the petition to CGRF and CGRF issued order dated 15/05/2024, and reduced the amount to Rs.4,19,189/-and the appellant is liable to pay the amount as per the revised demand. Aggrieved by the decision of the CGRF this appeal petition is filed to this Authority. |
P/038/2024/, The principal, Heera College of Engineering |
|
The appellant is the Principal of Heera College of Engineering and Technology situated at Panavoor, Nedumangad, Thiruvanathapuram. This college in an HT Consumer of the Licensee under Electrical Section Chullimanoor with tariff HT II (B) general. The appellant had defaulted the payment and the total arrear works out to Rs. 13,77,479/- for a period from 12/06/2023 to 11/06/2024. The notice was issued to the consumer as per section 56 (1) of the Electricity Act which leads to disconnection of power. The college and Hostel was taken over by the District administration for running the Covid quarantine centre for a period of 6 months from 18/03/2020. The power charges for this period was not paid by the appelant. This arrear was accumulated and the payments made there after was adjusted as per regulation 133 of the Kerala Electricity Supply Code 2014. The appellant has taken up the matter to the State Government for sanctioning the suitable compensation including the power charges. The appellant had filed the petition to the CGRF and CGRF issued the order 04/06/2024 stating that the appellant is liable to pay the amount. Aggrieved by the decision of CGRF, this appeal petition is filed to this Authority. |
P/047/2024, The Headmaster, Govt.U.P.School, Nadutheri, Pathanapuram |
|
The appellant is the Headmaster of Govt.U.P.S, Thalavoor, Kulakkada, Pathanapuram, Kollam Dist., A three phase service connection under the tariff LT 6A has given to this school in the name of Shri. Gangadharan, the Headmaster of the school on 31/03/1977. As the regular power charges are not paid from 03/2004 to 07/2007, the power was dismantled on 18/08/2008. Then the outstanding amount was Rs. 6,045/-. The letter was given to clear the dues on 25/08/2008 and the reminder notice was given on 15/09/2008. No action was taken by the school authorities for clearing the arrears and then the licensee initiated for R.R action. The next notice has been sent to the school on 30/11/2013 for the One time settlement of the outstanding addressing to Shri. Gangadharan, Headmaster the letter was not received by anybody as it is addressed to an individual. Later another letter send on 20/11/2014 was returned. The present headmaster has taken over charge on 29/05/2019 and he had received notice of the dues only on 2023. The appellant has filed the petition to CGRF and CGRF issued order dated 10/06/2024 stating that the appellant is liable to pay arrear bills issued by the licensee. Aggrieved by the order of the CGRF, this appeal petition is filed to this Authority. |
KERALA ELECTRICITY OMBUDSMAN
D.H. Road & Foreshore Road Junction,
Near Gandhi Square,
Ernakulam, Kerala-682 016
Ph: 0484 2346488, Mob: 8714356488
Send an email to info@keralaeo.org
Today | 4022 | |
All | 5670202 |
P/063/2024, Sri. Rajendran .K |
03-01-2025 |
P/064/2024, Sri. Joe.I. Mangaly |
03-01-2025 |
P/082/2024, ശ്രീ.റിയാസ്.ഇ.ആർ |
03-01-2025 |
P/070/2024, ശ്രീ.സ്മിനോജ്.എം.എസ് |
03-01-2025 |
P/069/2024, ശ്രീ.അബ്ദുൾ കരിം സഹറുദ്ദീൻ P.M. |
03-01-2025 |
P/068/2024, ശ്രീമതി.സുകുമാരി.പി |
03-01-2025 |
P/065/2024, ശ്രീമതി. ജോസ്ന കെ.ജെ |
03-01-2025 |
RP/08/2024, Sri. Sunil Thomas |
04-12-2024 |
P/067/2024, Sri. Arun. C |
04-12-2024 |
P/066/2024, Sri. Shajan . N.P |
04-12-2024 |