Downloads
Overview Search Downloads Submit file Up
Category: Orders
Order by: Default | Name | Date | Hits | [Descending]
Orders Files: 1280
Orders of Kerala Electricity Ombudsman  in pdf format
Files:
P/017/2024- M/s Bharat Petroleum Corporation Ltd

Download 
Download

The appellant M/s Bharat Petroleum Corporation Ltd is an Extra High Tension Consumer of the Licensee, KSEBL. This connection was availed for their fuel pumping station situated at Irumpananm, Ernakulam. M/s Bharat Petroleum Corporation Ltd. is a public sector undertaking engaged in Refining and marketing of petroleum products. The Irumpanam facility is for storing the fuel which is pumping from Kochi Refinery which is also a unit of M/s BPCL. There are separate tanks for petrol, diesel and kerosene. The EHT connection with connected load 2634 kW and contract demand 2.6 MVA with consumer no. LCN-15/3809. There are different high capacity HT pumpsets for pumping the petroleum products to their storage facility at Coimbatore and Karur. This is pumped through the Cochin- Coimbatore- Karur Pipeline which was commissioned on 2002. This service connection was charged under EHT industrial tariff. On inspecting the premises by the officials of the licensee, it is noticed that there is no manufacturing/allied activities are happening and hence the tariff applied is not correct and the applicable tariff would be EHT commercial. The short assessment on the basis of tariff change for a period from 01/05/2013 to 31/07/2023 is worked to Rs. 34,09,90,839. The demand notice for this short assessment was issued to the appellant on 27/12/2023. The appellant has filed the petition to CGRF contenting the action of licensee and CGRF issued order on completing the procedures which states that the appellant is liable to pay the short assessment amount and the tariff applicable is EHT commercial. The aggrieved appellant has filed the appeal petition to this authority.
P/019/2024- Sri. Mohammed Khais- Jahangir Musaliar, M/s Pristne Plastics and Polymers

Download 
Download

The appellant is the owner of M/s Pristine Plastics and Polymers on MSME unit at Mukhathala, Kollam. The HT power connection was availed during 2015 with consumer no. LCN 9/7625 AND WITH THE CONNECTED LOAD 182.176 kw and the contract demand 130 kVA. The power to this factory was disconnected on 31/07/2022 due to non payment of the power charges, invoking the Regulation 138(1) (a) of the Kerala Electricity Supply Code 2014. The power was dismantled on 19/04/2023. The dismantling period was considered a 6 months from the date of disconnection and accordingly the balance amount payable is worked to Rs. 8,35,075/- on adjusting the security deposit. The appellant aggrieved by the above said arrear and claimed that the demand is not as per Electricity Supply Code 2014. Filed petition to the CGRF and CGRF issued order dated 04/03/2024 stating that the appellant is liable to pay the demand raised by the licensee. Aggrieved with the decision of CGRF, this appeal petition is filed to this authority.
P/012/2024- സെക്രട്ടറി, മണമ്പൂർ ഗ്രാമ പഞ്ചായത്ത്

Download 
Download

മണമ്പൂർ ഗ്രാമപഞ്ചായത്തിലെ പെരുംകുളം, പോപ്പുലാർ, പൂവത്തുംമൂല എന്നീ ട്രാൻസ്ഫോമറുകളിൽ നിന്നുള്ള ലൈനിൽ സ്ഥാപിച്ചിട്ടുള്ള തെരുവു  വിളക്കുകളുടെ സർവ്വേ നടത്തിയപ്പോൾ വളരെയധികം തെരുവ് വിളക്കുകൾ സ്ഥാപിച്ച തീയതി മുതൽ ബില്ല് ചെയ്യാതെ കിടക്കുന്നതായി കണ്ടും, സർവ്വേ റിപ്പോർട്ടിന്റെ അടിസ്ഥാനത്തിൽ കുടിശ്ശികയായി 2,35,027/- രൂപയ്ക്കുള്ള ബിൽ  നൽകുകയുണ്ടായി. എന്നാൽ ബിൽ പ്രകാരമുള്ള കറന്റ് ചാർജ് പഞ്ചായത്ത് കൃത്യമായി അടച്ചു വരുന്നതിനാൽ ഇത്തരം കുടിശ്ശിക  വരാൻ സാധ്യതയില്ലെന്നും, അതിനാൽ പഞ്ചായത്ത് അടയ്ക്കാൻ ബാധ്യസ്ഥർ അല്ലെന്നും, പഞ്ചായത്ത് കമ്മിറ്റി തീരുമാനിക്കുകയും അത് ലൈസൻസിയെ അറിയിക്കുകയും ചെയ്തു. കുടിശ്ശിക തുക അടവാകാത്തതിനാൽ റവന്യൂ റിക്കവറി നടപടികളുമായി മുന്നോട്ടു പോകാൻ ലൈസൻസി  തീരുമാനിച്ചു. അങ്ങനെ അപ്പീൽ പരാതിക്കാരൻ CGRF-നെ സമീപിക്കുകയും CGRF നടപടികൾ പൂർത്തിയാക്കി 15/01/2024-ൽ ഉത്തരവിറക്കുകയും ചെയ്തു. അതിന്റെ അപ്പീലായിട്ടാണ് ഈ പരാതി ഓംബുഡ്സ്മാൻ സമക്ഷം സമർപ്പിച്ചിട്ടുള്ളത്.

Contact Us

KERALA ELECTRICITY OMBUDSMAN
D.H. Road & Foreshore Road Junction,
Near Gandhi Square,
Ernakulam, Kerala-682 016
Ph: 0484 2346488, Mob: 8714356488

Any Queries?

Send an email to info@keralaeo.org

Do you Know?

Consumers should submit  petitions to CGRF first before appealing Ombudsman.

Visitors Counter

mod_vvisit_counterToday2898
mod_vvisit_counterAll5293793