Downloads
Overview Search Downloads Submit file Up
Category: Orders
Order by: Default | Name | Date | Hits | [Descending]
Orders Files: 1228
Orders of Kerala Electricity Ombudsman  in pdf format
Files:
P/037/2023- Shri. Muhammed Nazeer

Download 
Download

The appellant Sri. Muhammed Nazer is the consumer of the licensee under the electrical section, Attingal with consumer number 1145319025063. This is a three-phase connection under the tariff LT VII A. The connection was availed for a partnership firm named Nakshathra Tiles. The registered connected load is 42 kw and it was connected on 16/06/2015. The shop is located in Alamcode Junction. The appellant has not consumed any energy from 07/08/2020 to 01/08/2023. The licensee is only demanded the fixed charges for this consumer as per the rate approved by the Kerala State Electricity Regulatory Commission. The appellant has not paid any charges from 01/01/2021 to 16/11/2022. The total outstanding amount comes to Rs. 1,84,734/-. Though the instalment facility was given, the appellant was not keen in remitting the payment. The shop was closed due to the Covid 19 pandemic due to the lockdown declared by the government. The appellant is not in a position to remit the huge amount as the shop was closed during the time. They approached CGRF and CGRF ordered that the appellant is liable to pay the charges. Aggrieved by the decision of CGRF, the appellant filed this appeal petition to the authority.
P/036/2023- Sri. Paul Robson

Download 
Download

The appellant Sri. Paul Robson was the registered consumer with number 1155406010243 under college Electrical Section. This connection was in LT IV A tariff. The appellant was not made the power charges since December 2021 as the payment was defaulted the licensee has disconnected the power according to the regulation of Kerala Electricity Supply Code 2014. The licensee could not locate the consumer and hence the notice for the disconnection was not served. The premises was on lease from Mr. Krishnamoorthi and the lease deed signed during 2008 and then the deed was neither renewed nor extended. At present the appellant is not the legal tenant of the premises. The owner submitted application for dismantling the power connection and the licensee has disconnected the power connection. Now the appellant approached the licensee for the reconnection of the power. The section office has asked to produce the legal document showing the occupancy of the premises and the appellant could not produce the same and hence the power was not connected. Aggrieved consumer approached the CGRF and CGRF order dated 23/06/2023 states that the CGRF is not to intervene in the case as the case is pending before the Hon’ble Rent Control Court, EKM. Aggrieved by the decision of CGRF this appeal petition was filed to this authority.
P/0352023- Sri. Biju Kuriakose

Download 
Download

The appellant shri Biju Kuriakose is a consumer of the licensee under the tariff LT IA with the consumer number: 11573444011859 under Thiruvaniyoor Section. The consumer installed a Solar Plant of 10kw capacity on 13/12/2018. The connected load of the consumer is 29.35 kw. The solar plant is the grid interactive solar system. The meter has been converted CT/PT connected meter as his connected load exceeded 25kw on 18/12/2020. The zone wise reading of the TOD meter started from 7/2022 onwards. On verification of the zone wise reading, it recorded export of energy in the Zone II and Zone III which shows that there is connection error in CT. Accordingly the sub engineers visited the site and found that the secondary terminals of the CT connected wrongly to the meter. As the polarity was reversed the meter recorded export as import and import as export. The connections were rectified and a mahazzar was prepared. A short assessment bill for Rs. 3, 09,269/- was issued to the appellant. The CGRF was approached and CGRF issued order stating that the appellant is liable to pay the short assessment bill with effect from 18/12/2020. Aggrieved by the decision of CGRF, this appeal petition is filed.

Contact Us

KERALA ELECTRICITY OMBUDSMAN
D.H. Road & Foreshore Road Junction,
Near Gandhi Square,
Ernakulam, Kerala-682 016
Ph: 0484 2346488, Mob: 8714356488

Any Queries?

Send an email to info@keralaeo.org

Do you Know?

Consumers should submit  petitions to CGRF first before appealing Ombudsman.

Visitors Counter

mod_vvisit_counterToday278
mod_vvisit_counterAll4719814