Downloads
Overview Search Downloads Submit file Up
Category: Orders
Order by: Default | Name | Date | Hits | [Descending]
Orders Files: 1265
Orders of Kerala Electricity Ombudsman  in pdf format
Files:
P/010/2017 Sri. Abdul Gafoor M.A. Mudickal P.O., Perumbavoor

Download 
Download

The appellant Sri. Abdul Gafoor M.A., is an industrial consumer with consumer No. 9352 having connected load of 47 kW under Electrical Section, Vazhakulam. On 16-03-2016, the APTS of KSEB conducted a surprise inspection in the above premises and found that voltage of R phase (out of 3 phases) was missing in the energy meter due to fault in the connection to the meter. When one phase voltage being not sensed by the energy meter, the energy recorded would be only 2/3rd of the actual consumption. Hence the appellant was served with a short assessment bill for an amount of Rs. 1,59,474.00 on 19-03-2016. In order to recover the charges for the unrecorded portion of energy, the assessment was made for the period of one year, when the meter was found recording less than the actual consumption. The appellant lodged complaint before the Assessing officer, the Assistant Engineer, against the said assessment which was disposed of with a direction to remit the assessed amount before 05-09-2016. Being not satisfied with the decision of the Assistant Engineer, the appellant approached the CGRF, Central Region, Ernakulam with a petition and the Forum also dismissed the petition vide its order dated 21-12-2016. Feeling aggrieved against the decision of the Forum, the appellant has submitted the appeal petition before this Authority. The actual consumption recorded in the meter itself was taken for assessing the unrecorded portion of energy. The increase in consumption recorded after the rectification of defects clearly indicates and justifies the respondent’s claim that the appellant was undercharged for the period from 01/2015 onwards. So, a probable conclusion can be arrived at in this case is that the voltage of ‘R’ phase was missing from 01/2015 onwards as per the consumption pattern of the appellant. Under the above circumstances the short assessment issued by the respondent is found in order. In view of the above factual and legal position, I don’t find any reason to interfere with the short assessment bill dated 19-03-2016 issued for Rs. 1,59,474.00. Hence the appeal is dismissed. The order of CGRF No. CGRF-CR/Comp./71/2016-17 dated 21-12-2016 is upheld. No order as to costs.
P/016/2017 Sri. Muhammed Rafeeque M.A. Mudickal P.O., Perumbavoor

Download 
Download

The appellant, Sri Muhammed Rafeeque M.A., is an industrial consumer with consumer No. 12042 having connected load of 47 kW under Electrical Section, Vazhakulam. On 16-03-2016, the APTS of KSEB conducted a surprise inspection in the above premises and found that voltage of R phase (out of 3 phases) was missing in the energy meter due to fault in the connection to the meter. When one phase voltage being not sensed by the energy meter, the energy recorded would be only 2/3rd of the actual consumption. Hence the appellant was served with a short assessment bill for an amount of Rs. 2,92,664.00 on 19-03-2016. In order to recover the charges for the unrecorded portion of energy, the assessment was made for the period of seven months, when the meter was found recording less than the actual consumption. The appellant lodged complaint before the Assessing officer, the Assistant Engineer, against the said assessment, on 26-05-2016 which was disposed of with a direction to remit the assessed amount before 05-09-2016. Being not satisfied with the decision of the Assistant Engineer, the appellant approached the CGRF, Central Region, Ernakulam, with Petition No. OP 66/2016-17 and the Forum also dismissed the petition vide its order dated 31-12-2016. Feeling aggrieved against the decision of the Forum, the appellant has submitted the appeal petition before this Authority. Here in this case, the non recording of one phase of the energy meter in the appellant’s premises was detected by the respondent during the inspection conducted on 16-03-2016 but the appellant was charged only for 7 months instead of 12 months as per the above Regulation. The actual consumption recorded in the meter itself was taken for assessing the unrecorded portion of energy. The increase in consumption recorded after the rectification of defects clearly indicates and justifies the respondent’s claim that the appellant was undercharged for the period from 09/2015 onwards. So, a probable conclusion can be arrived at in this case is that the voltage of ‘R’ phase was missing from September 2015 onwards as per the downloaded data. Under the above circumstances the short assessment issued by the respondent is found in order. In view of the above factual and legal position, I don’t find any reason to interfere with the short assessment bill dated 19-03-2016 issued for Rs. 2,92,664.00. Hence the appeal is dismissed. The order of CGRF in OP No. CGRF-CR/Comp.66/2016-17 dated 31-12-2016 is upheld. No order as to costs.
P/007/2017 Sri M.J. Thomas, Maradu,, Ernakulam

Download 
Download

The appellant, Sri M.J. Thomas, is a HT consumer having a three phase connection with consumer code LCN2/6664 under Electrical Section, Maradu under HT IV tariff. On 13-05-2016, the HT Meter Test Unit of KSEB conducted an inspection in the premises of the appellant and it was found that there is current failure on ‘R’ phase from 23-08-2014 onwards. On detailed examination it was revealed that the ‘R’ phase in the CT meter was faulty and a flash mark is seen on the ‘R’ phase PT bush. Further, the respondent issued direction to the appellant to replace both CT and PT. The appellant was issued with a short assessment bill amounting to Rs. 5,05,159.00 on 29-08-2016, for the meter faulty period from 8/2014 to 04/2016. Aggrieved by this, the appellant approached the CGRF, Ernakulam by filing a Complaint No. 72/2016-17. The CGRF dismissed the petition holding that the short assessment bill dated 29-08-2016 for Rs. 5,05,159.00 was in order. Feeling aggrieved against the above decisions of CGRF the appellant has approached this Authority with this appeal petition. In the instant case, it is proved beyond doubt that one phase of the energy meter was missing from 23-08-2014 and thus the appellant has actually consumed the energy, the short assessment bill issued for the period from 8/2014 to 04/2016 as per Regulation 152(3) is found in order. It is also found that the short assessment bill is calculated based on the average consumption of previous 3 months and the consumption after replacing the CT/PT is higher than the previous average. Hence the appellant is liable to remit the amount without any interest. In view of the above factual and legal position, I don’t find any reason to interfere with the short assessment bill issued dated 29-08-2016 for Rs. 5,05,159.00. Hence the appeal is dismissed. The order of CGRF in OP No CGRF-CR/Comp./72-2016-17/475 dated 21-12-2016 is upheld. No order as to costs.

Contact Us

KERALA ELECTRICITY OMBUDSMAN
D.H. Road & Foreshore Road Junction,
Near Gandhi Square,
Ernakulam, Kerala-682 016
Ph: 0484 2346488, Mob: 8714356488

Any Queries?

Send an email to info@keralaeo.org

Do you Know?

Consumers should submit  petitions to CGRF first before appealing Ombudsman.

Visitors Counter

mod_vvisit_counterToday2435
mod_vvisit_counterAll5040545