Downloads
Overview Search Downloads Submit file Up
Category: Orders
Page 2 of 427
Order by: Default | Name | Date | Hits | [Ascending]
Orders Files: 1280
Orders of Kerala Electricity Ombudsman  in pdf format
Files:
P 77/09 Mini Krishna Swamy Vs AEE Palarivattom

Download 
Download

Change of Ownership of service connection - Special Deposit and Indemnity Bond insisted - Ordered to refund Special CD with Twice bank  rate of interest
P 103/09 Sasidharan Vs AEE Punnayurkulam

Download 
Download

Property under dispute - boundary not marked - objection on installing poles - plea for shifting - not allowed - Revenue authorities to decide
Demand of the consumer to install the meter at his house (at the end of the UG Cable) for his UG cable electric service connection- P/327/2012 – Rahmath Beevi, Kottayam.

Download 
Download

The appellant has applied for conversion of her existing 1- phase UG Cable electric service connection to three phase UG connection. It was directed the consumer to shift the position of the meter from the existing place (at the wall of house) to the beginning of the cable i.e. at the boundary of the premises or near the gate of the premises of the consumer. Held that the consumer is bound to act as per the prevailing regulations, as there exists specific rule to provide such UG connections.

Contact Us

KERALA ELECTRICITY OMBUDSMAN
D.H. Road & Foreshore Road Junction,
Near Gandhi Square,
Ernakulam, Kerala-682 016
Ph: 0484 2346488, Mob: 8714356488

Any Queries?

Send an email to info@keralaeo.org

Do you Know?

Consumers should submit  petitions to CGRF first before appealing Ombudsman.

Visitors Counter

mod_vvisit_counterToday2792
mod_vvisit_counterAll5293687