P/28/2024 Shamsudheen |
|
The appellant Shri. Shamsudheen is a prosumer with the Licensee(KSEBL)having two connections one in Electrical Section Kongad and another in Electrical Section Angadippuram. The appellant had installed solar plant of 3.32 kW at Kongad and 4.3 KW at Angadippuram. The appellant has applied to the Licensee to wheel the excess energy produced in the Angadippuram plant to use in the Kongad Service connection. The Licensee had delayed the sanctioning of the same stating that there is no provision in the ‘Oruma Net’ to wheel the energy from a prosumer to another premises of the same consumer who is registered as a prosumer.The electrical section officials had taken up to higher level to get approval for permitting the wheeling of prosumer to prosumer. This process got cleared only after 5 months.The application submitted on 17/05/2023 and it had cleared on 27/10/2023. The Licensee has corrected the bill allowing the wheeling with effect from 08/2023. The appellant was aggrieved by the delayed action of the Licensee and demanded compensation as per regulation. The petition filed CGRF and CGRF issued order on 20/03/2024 after completing the procedures. Aggrieved by the decision of CGRF, the appeal petition is filed to this Authority. |
P/027/2024 Shamsudheen |
|
The appellant Shri. Shamsudheen is a prosumer with the Licensee(KSEBL)having two connections one in Electrical Section Kongad and another in Electrical Section Angadippuram. The appellant had installed solar plant of 3.32 kW at Kongad and 4.3 KW at Angadippuram. The appellant has applied to the Licensee to wheel the excess energy produced in the Angadippuram plant to use in the Kongad Service connection. The Licensee had delayed the sanctioning of the same stating that there is no provision in the ‘Oruma Net’ to wheel the energy from a prosumer to another premises of the same consumer who is registered as a prosumer.The electrical section officials had taken up to higher level to get approval for permitting the wheeling of prosumer to prosumer. This process got cleared only after 5 months.The application submitted on 17/05/2023 and it had cleared on 27/10/2023. The Licensee has corrected the bill allowing the wheeling with effect from 08/2023. The appellant was aggrieved by the delayed action of the Licensee and demanded compensation as per regulation. The petition filed CGRF and CGRF issued order on 20/03/2024 after completing the procedures. Aggrieved by the decision of CGRF, the appeal petition is filed to this Authority. |
P/023/2024 George Thomas |
|
The appellant Shri.George Thomas is the Managing Director of Pattom Royal Hotel who is a live HT consumer with consumer number 1345160017701 (LCN 11/6218) under the Electrical section, Kesavadasapuram. The HT service connection was connected on 18/08/2012, with contract demand 160 kVA and connected load 348 KW under the tariff HT IV A commercial. The power supply was availed for running the Hotel. The Licensee has noticed that the meter was struck and reading was not taken on 06/06/2023. The TMR division of Licensee had inspected the meter and reported that the LCD display is not legible and the software of the meter is corrupted and hence the meter was declared faulty. The Licensee has intimated the appellant to replace the meter and if not replaced within 2 months additional charge of 50% extra over the prevailing units for the said two months and one month thereafter. The Licensee has raised a demand for Rs.576594/- as the penalty for the meter faulty period due to non replacement of faulty meter within the notice period. The meter , ‘CT’ and ‘PT’ were replaced only on 03/02/2024. The appellant filed petition to the CGRF and CGRF issued order stating that the appellant is liable to pay the demand of penalty issued by the Licensee. Aggrieved by the decision of CGRF, this appeal petition is filed to this authority. |
KERALA ELECTRICITY OMBUDSMAN
D.H. Road & Foreshore Road Junction,
Near Gandhi Square,
Ernakulam, Kerala-682 016
Ph: 0484 2346488, Mob: 8714356488
Send an email to info@keralaeo.org
Today | 160 | |
All | 5670402 |
P/063/2024, Sri. Rajendran .K |
03-01-2025 |
P/064/2024, Sri. Joe.I. Mangaly |
03-01-2025 |
P/082/2024, ശ്രീ.റിയാസ്.ഇ.ആർ |
03-01-2025 |
P/070/2024, ശ്രീ.സ്മിനോജ്.എം.എസ് |
03-01-2025 |
P/069/2024, ശ്രീ.അബ്ദുൾ കരിം സഹറുദ്ദീൻ P.M. |
03-01-2025 |
P/068/2024, ശ്രീമതി.സുകുമാരി.പി |
03-01-2025 |
P/065/2024, ശ്രീമതി. ജോസ്ന കെ.ജെ |
03-01-2025 |
RP/08/2024, Sri. Sunil Thomas |
04-12-2024 |
P/067/2024, Sri. Arun. C |
04-12-2024 |
P/066/2024, Sri. Shajan . N.P |
04-12-2024 |